The subcontractor list you are owed before construction starts
Before construction starts, Texas obliges the contractor to give the owner each subcontractor by name, address and phone, and to update the list within 15 days of a change.
- Written by
- Dale Proctor
- Reviewed by
- Dale Proctor
- Published
- Applies to
- Aledo, Willow Park, Hudson Oaks, Weatherford, West Fort Worth, Benbrook, Granbury
There is a piece of paperwork Texas law says you should receive before a single trade sets foot on your lot, and most homeowners have never heard of it. It is not the contract, and it is not the plans. It is a list of names.
What §53.256 actually requires
Texas Property Code chapter 53 is the mechanic's lien chapter, and its Subchapter K deals with residential construction. Section 53.256 obliges the original contractor to "furnish to the owner before the commencement of construction a written list that identifies by name, address, and telephone number each subcontractor" — and to "provide the owner with an updated list of subcontractors and suppliers not later than the 15th day after the date a subcontractor or supplier is added or deleted."2
Name, address and telephone number: the statute is asking for a list you could actually act on, not a roster of company names. The waiver provision is the tell that the legislature meant it. The right to updates can be waived, but the waiver "must be conspicuously printed in at least 10-point bold-faced type," and the original list itself has to carry a notice in at least 10-point boldface telling the owner they may receive updates unless they sign that waiver.2 Requirements that can be signed away in the fine print do not get typography rules; ones the legislature expects people to notice do.
Alongside it, §53.255 requires the original contractor to deliver a disclosure statement to the owner for a residential construction contract.1 And §53.258 requires a disbursement statement, provided to the owner at the time the contractor requests payment.3
Three documents, three moments: disclosure at contracting, the list before work starts, a disbursement statement at each payment request.
Why the list is the useful one
The reason chapter 53 cares who the subcontractors are is that they can put a lien on your house. A subcontractor or supplier who is not paid by the contractor may have a claim against the property itself, even though the homeowner paid the contractor in full. That is the risk the chapter is built around, and the list is how the owner is given the information needed to see it coming.
Which makes the list genuinely useful for three ordinary purposes that have nothing to do with a dispute:
- You can check licenses. With names in hand you can look up the electrician and the A/C contractor at TDLR and the plumber at the plumbing board — see Checking a trade license in Texas.
- You can see the shape of the job. Whether the framing crew, the plumber and the electrician are long-standing relationships or a different name on every job is visible in the list and in its updates.
- You can ask about payment. Knowing who is owed lets you ask, sensibly, how and when they are paid, and what evidence of payment you will see.
What to do when the list arrives, and when it doesn't
- Ask for it before signing, not after. The obligation attaches before construction commences,2 but the conversation is easier at contracting than at the slab.
- Read the waiver. If your contract waives the right to updates, that waiver has to be conspicuously printed in at least 10-point bold-faced type.2 If you cannot find it, ask where it is. If you can, ask why.
- Note the 15-day rule and hold it. A list handed over once and never updated is not the thing the statute describes.2
- Keep every version. The dated sequence of lists is a record of who was actually on the job, which is exactly what nobody can reconstruct two years later.
- Read the disbursement statement at each draw, not just the first.3
The wider picture, briefly
None of this is a licensing regime. Texas has no state license for a homebuilder, and no agency regulating one — the Sunset Advisory Commission's page records that the state's residential construction regulator "was abolished and the Act expired on September 1, 2009."5 What replaced it is the contract, the statutory disclosures above, and the Residential Construction Liability Act, whose route through a defect dispute starts with a written notice to the contractor at least 60 days before filing suit.4
So the documents are the protection. That is a less satisfying answer than a license board, and it is the actual one. Your rights when you sign a build contract covers the contract side; Year five: what happens after move-in covers the notice process.
If you are about to sign, the list is a fair thing to ask for at the table.
Sources
- 1.Texas Property Code §53.255 — disclosure statement required for residential construction contracts · last checked
- 2.Texas Property Code §53.256 — the written list of subcontractors and suppliers, furnished before construction commences and updated not later than the 15th day after a change; waiver only in conspicuous 10-point bold-faced type · last checked
- 3.Texas Property Code §53.258 — the disbursement statement, provided when the contractor requests payment · last checked
- 4.Texas State Law Library — construction defects and the Residential Construction Liability Act: the 60-day pre-suit notice · last checked
- 5.Texas Sunset Advisory Commission — the Texas Residential Construction Commission was abolished and the Act expired on 2009-09-01 · last checked